DONE FOR YOU DESIGN, FROM 6 WEEKS
Your space fully done. Starting from 6 weeks. Not 6 months.
One team handles your design, sourcing, furniture and installation — start to finish. Your exact timeline is scoped and confirmed before we start, based on your project size, so you know the date going in instead of guessing.
Most people don't avoid redoing their space because they don't want it done. They avoid it because of what the process usually looks like.
"It'll just take a few weeks"
…that turns into 4 months, because every artisan is waiting on the next one and nobody owns the delay.
Five vendors, zero accountability
Carpenter blames the painter, painter blames the electrician — and you’re the one stuck following up daily.
Paid upfront, no guarantee
You’ve heard the stories. Money gone, finishing still rough, and the contractor’s gone quiet.
You're not even in Lagos to supervise
You need a team you can trust with eyes on the project daily — not one you have to chase from abroad.
Consultation & space audit
We walk your space (or review it on video call if you're not in Lagos), understand how you actually live in it, and lock your budget and style direction.
Design concept & moodboard
You see the full layout, furniture selections, and finishes before anything is built — so there are no surprises later.
Sourcing & fabrication
Our in-house woodwork and furniture team builds and sources everything to spec, on our own production timeline — not waiting on a third-party vendor. Larger or more complex scopes get extra weeks here, agreed upfront.
Delivery & installation
Everything arrives and goes in — furniture, lighting, finishing touches — handled by our own installation team.
Final styling & reveal
We style the space top to bottom and hand you the keys to a space that's fully done — not "almost ready."
Why a clear, confirmed timeline instead of "we'll see"?
One team, start to finish
Design, furniture, and installation all sit under one roof. If something needs fixing, you call one number — not five.
Built in-house, not outsourced
Our own woodwork and fabrication team builds your furniture on our schedule, so we’re not waiting on someone else’s delays.
You know the date before we start
Your timeline — minimum 6 weeks, more for larger or more complex projects — is confirmed at kickoff and tracked weekly, so you can plan your move-in, rental listing, or event around it.
Recent project






FAQ
Design concept, all furniture (sourced or built in-house), delivery, and full installation. Most projects run from 6 weeks — your exact timeline and scope are confirmed after the week-1 audit, before you commit to anything.
6 weeks is the minimum for a standard scope. Larger spaces, more rooms, or custom fabrication add time — we’ll give you the exact week count for your project before you pay anything.
Yes. We run the consult and weekly updates over video call, and you approve every stage remotely before we move to the next.
The design consult is ₦300,000. Right now, as part of our current promo, it’s ₦100,000 — and it’s fully deductible from your project cost if you go ahead with us, so you’re not paying twice.
We’ll walk you through the full project payment structure on your consult call, based on your scope and budget.
